Q.

How Much Does it Cost to Install a Sub Meter?

view 3659 Views

3 Answers

1 Year

Comment

whatsapp [#222222128] Created with Sketch. Send
0 2024-10-30T15:07:21+00:00

You can hire a local electrician to get your submeter installed but of course, it's better that you opt for an expert. We got our submeter installed at just Rs 259 by a NoBroker electrician just a couple of months ago and are happy with their service. In fact, their sub meter installation cost seemed to be the most affordable one than others. Let me describe what was included in this cost.

What is the Cost to Install Electric Submeter?

NoBroker charges Rs 259 for a sub meter installation and it includes

  • Installation of one sub-meter

  • Minor wiring work is included

  • Safe installation guaranteed

But in case they see that some additional material will be needed, they will charge for it separately.

Before opting for

NoBroker electrician service

, I checked out the submeter installation cost on other service providers’ websites and here is a list of them along with their charges:

Service Provider 

Submtere Installation Charge 

Backbonepillars

Rs 357

Merifixit

Rs 249.00 will be charged for the first 1 hour. After that, Rs. 60.00 will be charged for every thirty minutes and GST as applicable

So you can discuss with an electrician and know the charges but make sure they are professional. It is tricky work; hence, opt for only the best.

Read More:

How to install sub Meter?

 
0 2023-12-22T14:17:58+00:00

I would say every household should have a sub-meter installed. Whether you're a landlord wanting to bill tenants fairly or a resident seeking to track your electricity usage, understanding the

sub meter connection price

is crucial. I think sub-meters are a great way to monitor and manage individual electricity consumption in shared spaces. I installed a sub-meter for me and my tenant last month, so I can tell you the price and the factors that affect the price.

Factors Influencing Submeter Installation Cost

The cost of installing sub-meters in India depends on several factors:

  1. Type of Meter:
  • Single-phase:

    These are ideal for residential units and cost around Rs100 per meter.

  • Three-phase:

    These are used for commercial or industrial spaces and cost from Rs200 to Rs500 per meter.

  • CT Meter:

    They are used for high-power applications and cost around Rs500 per meter.

  • HT-PT Meter:

    These are used for very high voltage applications and cost around ₹1,050 per meter.

  1. Number of Meters:

    If you install more meters then it will raise costs due to increased materials and labour.

  2. Labor Costs:

    The labour rates vary depending on location and electrician expertise.

  3. Additional Requirements:

    If you also go for extra features like sensors or intercoms, it can increase costs significantly.

I will share with you the estimated

electric sub meter installation cost

in major Indian cities

through a table here.

City Average Cost (in Rs)

Bangalore

1,500 - 2,500

Mumbai

2,000 - 3,000

Delhi

1,200 - 2,000

Chennai

1,800 - 2,800

Kolkata

1,000 - 2,000

I hope this helps you.

Pay electricity bill with NoBroker and get cashback  Read More: How to Calculate Electricity Bill from Meter Reading?
1 2023-07-07T20:09:35+00:00

As an electricity provider, I have an idea of what is the sub meter installation cost in India. The price to install a sub meter usually varies depending on a number of variables, including the location, kind of property, and particular needs. The meter installation, skilled labour, and any other fees for inspections are typically included in the installation cost. Scroll down to get the price.

How much does it cost to install a sub meter?

The location has a big impact on the overall costs to install a sub meter. Due to the increased cost of living and labour, installation costs may be higher in urban regions. I have an idea of the installation costs in Haryana that I shared in the below table:

Particular Charges

Single phase meter 

Rs 100

Three phase meter 

Rs 200

Three phase LT-CT meter & In-built CT Meter 

Rs 500

Three phase HT-PT meter

Rs 1050

How to calculate bill from submeter?

If you have the current and last month's meter readings, you can easily compute the power cost. When discussing meter reading, two parameters come into play, which are:

  • kWh unit

  • Maximum demand (kW)

You can calculate the bill from the below formula:

Total Electricity Bill = Energy Charge + Fixed Charge + Electricity Duty

Where, 

Electricity Duty = (Energy Charge + Fixed Charge) x Tax Rate/100

Fixed Charge = Sanction Load x Fixed Charge Rate

Energy Charge = (Current Month Unit (Kwh) – Last Month Unit (Kwh)) x Unit Rate

I hope you got knowledge of cost to install electric submeter in India.

Pay your electricity bill conveniently and get assured cashback offers Read More -

Where is meter number on Adani electricity bill?

How to apply for new electricity meter in Telangana online?

 

Most Viewed Questions

Recently Published Questions

Flat 25% off on Home Painting
Top Quality Paints | Best Prices | Experienced Partners