There are two types of raw materials used in building constructions: organic and inorganic. Construction materials contribute up to 55% of the cost of construction. Recognizing and evaluating the qualitative criteria of the components is essential when building a house. To acquire the greatest results, it's essential to get a firm idea of
building materials construction estimates.
The amount of materials needed for the building is determined by the Development Area. Projection rates may change based on the architects or developers. We have provided a rough estimate of raw materials for a 1000 square foot house.
How to estimate building materials for home construction?You cannot arrive at an estimate without considering the following:
SandSand is mostly required in the manufacturing of plaster, RCC, concrete, filling and flooring. Sand must be well qualified and clear of any natural materials or fractures. The proportion of sand to the entire manufacturing cost is up to 11%. At 1.7 cubic feet per square foot, a 1000 square foot home would require 1700 cubic feet.
ClusterConcrete is usually made with cementitious material, which is mixed with water, cement and sand. To boost the concrete's strength, it must be clean and thick. For 1000 sq ft, about 1.25 cubic ft is consumed per sqft, resulting in approximately 1250 cubic ft. Granules can account for as much as 7% of the overall manufacturing costs.
Rods of steelSteel rods are one of the most important building elements in cement concrete strengthening. They come in a variety of categories, with the Fe-400 grade is considered the most popular. Steel rods are utilized at a rate of 2 kg per square foot of building space, making a total of 2000 kg of steel rods every 1000 square feet. Steel contributes around a quarter of the total material cost.
CementCement is extremely important in the building project. It is used in the preparation of concrete for RCC structures, concrete block construction, and house plaster. Cement accounts for up to 15 percent of the overall material cost. For a 1000 sq ft house, 0.5 cement sacks for each sqft of development is required, resulting in a total of 500 sacks weighing 45 kg.
Paint and Brick9x4x2 inch bricks are the most popular size for 8-inch structural work. The bricks or blocks should all have the same colour, size, and have crisp sharp lines. We need a minimum of 30000 to 35000 bricks per 1000 square feet. Bricks or blocks can account for up to 6% of the overall raw material prices. Paint usage per square foot of built-up area is 0.15 and 0.05 litres, respectively. Up to 5% of the overall raw material prices are contributed by paint.
This answer gives you the exact amount of raw material you need for low cost house construction in India.
If you are about to design the interior for your beautiful house, then NoBroker home interior designers are there to assist you productively. Read More: How much steel required for 1000 sq ft house construction? How much steel required for 1200 sq ft house construction? How much bricks required in 1 sq ft? How much bricks required for 1000 sq ft house?Your Feedback Matters! How was this Answer?
Shifting, House?
✔
Lowest Price Quote✔
Safe Relocation✔
Professional Labour✔
Timely Pickup & DeliveryIntercity Shifting-Upto 25% Off
Check Prices
Intracity Shifting-Upto 25% Off
Check Prices
City Tempo-Upto 50% Off
Book Now
Related Questions
Related Questions in Full House Renovation
Most Viewed Questions
Recently Published Questions
Authors Of The Question
0 Total Answers
How to estimate building materials for home construction
santosh
993 Views
1 Answers
3 Year
2021-12-22T10:41:06+00:00 2021-12-22T12:25:02+00:00Comment
Share